Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,786 - Thursday the 23rd of February 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    MOD PS03, TIME EXTENSION AND REPLACEMENT OF PRIMARY METERING
  • $7,992 - Tuesday the 24th of July 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    MOD PS04, ADDITIONAL INSPECTION SERVICES
  • $768,513 - Monday the 24th of September 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    DELIVERY ORDER NO. GSP0912NP5016, "USDC 7TH FLOOR MAGISTRATE CHAMBERS", RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE 411 W. FOURTH ST., SANTA ANA, CA
  • $7,119 - Monday the 10th of September 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    1. ONE HOUR WALL INCLUSION AS FOUND IN ASI 13.2 2. CREDIT FOR THE STAIR CANOPY 3. CREDIT FOR THE LINEAL DIFFUSERS
  • $64,420 - Tuesday the 6th of March 2012
    Public Buildings Service
    FACILITIES MANAGEMENT&SVCS PROGRAM DIVISION, CONTRACTS SECTION
    PROJECT: BUILT OF A LEED CAFETERIA LOS ANGELES FEDERAL BUILDING, 300 NORTH LOS ANGELES STREET LOS ANGELES, CA 90012 CONTRACT TO PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT TO PERFORM THE FOLLOWING ITEMS: 1. EAST ENTRANCE HALLWAY CEILING DECK ENCAPSULATION, AIR CLEARANCE AND PATCHING AND PAINTING OF LOBBY; 2. FIREPROOFING IN THE 1ST AND 2ND FLOOR CAFETERIA SPACE.
  • $63,718 - Monday the 10th of September 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    1. ADDITION OF VETERANS SUPERVISION FOR NIGHT WORK. 2. LOWER CEILING IN SECURITY OFFICES AND HALL SOFFIT ADDITION (ASI 20). 3. NEW WALLS - WEST SIDE EATING AREA (ASI 14). 4. EAST WALL TREATMENT. 5. PONY WALL ABOVE 2ND FLOOR WALKWAY. CRITICAL BARRIER NEEDED FOR LOBBY CEILING (UN-ENCAPSULATED) FROM THE CEILING SPACE OVER OUR EATING/SERVERY. 6. PANEL AND SERVICE TIE IN TO 3RD FLOOR.
  • $46,061 - Thursday the 23rd of February 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    MOD PS05, COVERING CE9004
  • $41,053 - Monday the 10th of September 2012
    Public Buildings Service
    DESIGN AND CONSTRUCTION DIVISION
    THE FOLLOWING ARE ADDITIONAL TO THE TASK ORDER: -IMPROVEMENTS TO THE EXISTING FIRE SPRINKLER SYSTEM. -REMOVAL/ADJUSTMENT OF EXISTING PLUMBING, MECHANICAL, ELECTRICAL AND LOW VOLT LINES TO ACCOMMODATE INSTALLATION OF NEW SERVICES. -ADDITION OF A DOOR CLOSER ON THE SERVICE AREA RESTROOM DOOR.
  • $1,674,788 - Monday the 23rd of January 2012
    Public Buildings Service
    LOS ANGELES SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
    AWARD OF DELIVERY ORDER NO. GSP0912NP5001, "HAWTHORNE ROOF REPLACEMENT", HAWTHORNE FEDERAL BUILDING, 15000 AVIATION BLVD., HAWTHORNE, CA

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.