We Lyons Construction Co Inc
- View government funding actions
- Walnut Creek, CA 945982894
- Phone: 925-658-1600
- Corporate URL: www.welyons.com
- Estimated Number of Employees: 45
- Estimated Annual Receipts: $22,900,000
- Business Start Date: 1926
- Contact Person: Greg Lyons
- Contact Phone: 925-658-1600
- Contact Email: glyons@welyons.com
- Business Structure:
- Corporate Entity (Not Tax Exempt)
- Business Type:
- Self Certified Small Disadvantaged Business
- For Profit Organization
- Subchapter S Corporation
- Industries Served: New Multifamily Housing Construction (except For-Sale Builders), Commercial and Institutional Building Construction
- Product Areas: TRANSPORTATION/TRAVEL/RELOCATION- TRAVEL/LODGING/RECRUITMENT: LODGING, HOTEL/MOTEL, LODGING - HOTEL/MOTEL
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $71,872 - Thursday the 23rd of February 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
THE PURPOSE OF THE MODIFICATION IS TO DEMOLISH THE EXISTING FIRE SPRINKLER SYSTEM WITH BRANCH LINES TO ACCOMMODATE NE WHIGH CEILING SYSTEMS FOR US DISTRICT COURT. THE DELAY IN RESOLVING ALL SITE OCNDITIONS HAD AN IMPACT ON THE CRITICAL PATH RESULTING IN A CONTRACT TIME EXTENSION TO JUNE 14, 2012. (SEE SCOPE OF WORK FOR FURTHER DETAILS). - $6,796 - Friday the 4th of May 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
REPLACE EXISTING ELEVATOR CALL BUTTON AND FIRE MAN'S PHONE JACK TO ACCOMMODATE THE NEW DESIGN. RELOCATE THE IR DEVICE TO A NEW LOCATION. PAINT FLAT BLACK BEHIND STONE PANEL IN JUDGE'S BENCH&FURNISH AND INSTALL 36 X 36 WOOD PANEL TO DOOR #200 F. MECHANICALLY CHIP THE EXISTING FLOOR OF THE ELEVATOR LOBBY TO RECEIVE NEW FLOORING. - $57,096 - Friday the 21st of September 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
MODIFICATION TO ADD CAULKING IN CELL BLOCK, LOW VOLTAGE WIRE, INSTALL ACCESS PANEL, REPLACE EXISTING LOCK/FOLDGER ADAMNS D9378 AND PAINT DOORS AND SPEAKERS, DISCONNECT SWITCH FOR JUDGE LIFT, MODIFY WINDOW WALL WAINSCOT IN THE LOBBY, PLINTH BLOCK AT THE DOOR CASING, MISC. CASEWORK&ADDITIONAL FOOT REST IN CLERK'S WORK STATION. - $39,931 - Wednesday the 15th of February 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
MODIFICATION PS04 IS ISSUED BASED ON RFI #4 - MODIFICATION OF PLUMBING SYSTEM IN MARSHAL AREA. 1ST FLOOR DUE TO HIDDEN OBSTRUCTIONS RESULTED IN EFFECTING OTHER SYSTEMS AS WELL; INCLUDING MECHANICAL, CEILING AND SPRINKLER SYSTEM; PLUMBING IS CONNECTED WITH 2ND FLOOR JURY BATH ROOM; #28 SECURITY MESH AND TWO LAYERS OF DRY WALL/PATCHING, AND FINISH AND PROVIDE PERACENTRIC LOCKS IN THE DETENTION AREA. - $21,781 - Friday the 27th of April 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
FURNISH AND INSTALL CUSTOM PRISONER BENCH IN CELL 233B, FURNISH&INSTALL A NEW CUSTOM-MADE BUCKET FOR THE NEW 30 AMP MOTOR ON 5TH FLOOR, EXPEDITE THE DELIVERY OF THE SECURITY WALL SYSTEM MATERIAL BY KANE STERLING FOR USMS CELL BLOCK - $18,058 - Friday the 4th of May 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
REPLACE SEVEN (7) DOORS - #200B, 200C, 200D, 200E, 202, 223 AND PROVIDE RIFT SAWN OAK VENEER ON BOTH SIDES TO MATCH ALL OTHER MILL WORK FINISHES WITHIN THE COURTROOM AND THE JUDGES CHAMBER AREA. - $18,046 - Tuesday the 10th of January 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
MODIFICATION ISSUED FOR ADDITIONAL DEMOLITON OF FRAMING AND DRYWALLS BASED ON RFI RESPONSES (RFI'S 24&25) $4,42800; ADDT'L WORK REQUIRED TO RELOCATE EXISTING AV CONDUIT AND EXISTING ELECTRICAL BOS - $13,618.00, TOTAL - $18,046.00 - $17,689 - Tuesday the 10th of January 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
THIS MODIFICATION IS ISSUED FOR THE FOLLOWING: PROPOSED AND ACCEPTED CREDIT TO GSA DUE TO CHANGE IN SCOPE BY AV CONSULTANT FOR AV SYSTEMS ($2,579.00, CREDIT TO GOV'T) PROPOSED AND ACCEPTED ADDITIONAL COST TO GSA TO RELOCATE EXISTING AV CONDUIT AND EXISTING ELECTRICAL BOS; $20,267.69 (ADDT'L COST TO GOV'T). - $16,487 - Friday the 9th of November 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
THIS MODIFICATION WAS ISSUED BECAUSE THE A/E WAS DIRECTED TO: INSTALL WOOD CASED JAMB ON 7 DOORS, TO EXTEND WOOD PLASTER ON GRID LINE B5 TO BE SIMILAR TO THAT ON 3RD FLOOR COURTROOM, FRAME THE ELEVATOR LOBBY WALL TO RECEIVE MARBLE TRIM ALL AROUND THE ELEVATOR DOORS TO BE CONSISTENT WITH ALL COURT ELEV. LOBBY, RAISE CEILING AT THE JUDGE'S CORRIDOR TO ALLOW SPACE FOR THE ELEVATOR CLOSURE FOR THE JUDGE'S LIFT AS THE DESIGN DIDN'T IDENTIFY IT, AND SPECIFIED AV EQUIPMENT IS NO LONGER AVAILABLE FOR VIDEO STREAMING. - $16,105 - Tuesday the 25th of September 2012
Public Buildings Service
SAN FRANCISCO SERVICE CENTER, CONSTRUCTION SERVICES BRANCH
THIS MODIFICATION IS ISSUED TO ADD ONE LIGHT FIXTURE I NTHE JUDGE'S CHAMBER CORRIDOR AND TO MODIFY JUDGE'S BENCH TO ELIMINATE THE SIGHT LINE PROBLEM BETWEEN THE JUDGE, CLERK, AND REPORTER BETWEEN THE JUDGE AND THE WITNESS.
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.