- $9,603 - Tuesday the 24th of July 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 016 PROVIDE CAMERA SERVICE TO SURVEY EXISTING 18" STORM DRAIN LINE SOUTH FROM A STREET AND REPLACE EXISTING PORTION OF 18" STORM DRAIN LINE THAT CROSSES A STREET WITH 2 8" DUCTILE IRON PIPES, DESIGN/BUILD U.S. ARMY RESERVE CENTER, FAIRFIELD (CONCORD), CA - $81,649 - Thursday the 26th of April 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 004 DEWATERING OF SITE BY CONTROLLING WATER SEEPAGE AT NORTH SIDE OF STORAGE BUILDING PAD USING EARTHEN DAMS, DRAINAGE DITCHES, PUMPING OF ACCUMULATED WATER INTO TRUCKS AND SPREADING WATER ON SITE, DESIGN/BUILD U.S. ARMY RESERVE CENTER, FAIRFIELD (CONCORD), CA - $62,091 - Thursday the 10th of May 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 012 PROVIDE PERMANENT DRAINAGE STRUCTURES TO CONTROL WATER SEEPAGE AT NORTH SIDES OF TRAINING/STORAGE AND MAINTENANCE SHOP BUILDINGS, TO INCLUDE 6" PERFORATED AND 6" SOLID PIPE ALONG WITH RIPRAP PROTECTION, U.S. ARMY RESERVE CENTER, CONCORD (FAIRFIELD), CA - $550,000 - Monday the 26th of March 2012
Department Of Army
W072 ENDIST LOUISVILLE
324341 CONSTRUCT FAIRFIELD(CONCORD)ARC - THE PURPOSE OF THIS ACTION IS TO EXERCISE OPTION 1 FOR OMAR BONA FIDE NEED COLLATERAL EQUIPMENT. - $4,997 - Tuesday the 24th of January 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 005 DEMOLISH EXISTING BUILDING CONCRETE FOOTINGS AND CONCRETE AROUND DUCTWORK, DESIGN/BUILD U.S. ARMY RESERVE CENTER, CONCORD, CA - $48,127 - Tuesday the 13th of March 2012
Department Of Army
W072 ENDIST LOUISVILLE
324341 CONSTRUCT FAIRFIELD(CONCORD)ARC - - $40,000 - Wednesday the 18th of January 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 002 ABATE ASBESTOS MASTIC AT DUCTWORK UNDER EXISTING BUILDING SLABS AND DEMOLISH EXISTING BUILDING CONCRETE FOOTINGS, DESIGN/BUILD U.S. ARMY RESERVE CENTER, FAIRFIELD (CONCORD), CA - $38,002 - Monday the 18th of June 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 013 PROVIDE 2 WATER CONNECTIONS, 2 SEWER CONNECTIONS AND 1 GAS CONNECTION, DESIGN/BUILD U.S. ARMY RESERVE CENTER, CONCORD, CA - $30,781 - Tuesday the 11th of September 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 020 OVER-EXCAVATE WET SUBGRADE AT SOUTHEAST END OF MILITARY EQUIPMENT PARKING LOT AND REPLACE WITH GEO-TEXTILE FABRIC AND AGGREGATE BASE, DOWNLOAD WATER SAMPLING TEST RESULTS FOR STORMWATER POLLUTION PREVENTION PROGRAM COMPLIANCE AND COMPENSATION FOR STANDBY TIME FOR CONCRETE CREW AND EQUIPMENT WAITING FOR GATE TO BE OPENED, U.S. ARMY RESERVE CENTER, FAIRFIELD (CONCORD), CA - $25,069 - Wednesday the 25th of January 2012
Department Of Army
W072 ENDIST LOUISVILLE
CASE 002 ABATE ASBESTOS MASTIC AT DUCTWORK UNDER EXISTING BUILDING SLABS TO BE DEMOLISHED; REMOVE AND DISPOSE OF EXISTING POTABLE WATER LINE, DESIGN/BUILD U.S. ARMY RESERVE CENTER, CONCORD, CA
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.