The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Watterson Construction Company

  • Watterson Construction Company

  • View government funding actions
  • Anchorage, AK 995181519
  • Phone: 907-563-7441
  • Estimated Number of Employees: 100
  • Estimated Annual Receipts: $75,000,000
  • Business Start Date: 1981
  • Contact Person: Breanne Hood
  • Contact Phone: 907-563-7441
  • Contact Email: BHOOD@WCCAK.COM
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • For Profit Organization
  • Industries Served: Commercial and Institutional Building Construction
  • Product Areas: FILTERS AND NETWORKS, ELECT ELECTRONIC MEASURING INSTRUMT, ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $8,673 - Wednesday the 2nd of November 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 10, OVEN FOR STRUCTURAL REPAIR (AIRFRAME). PROVIDE DESIGN ENGINEERING AND CONSTRUCTION TO PROVIDE SPACE AND UTILITIES FOR A COMMERCIAL OVEN IN THE STRUCTURAL REPAIR (AIRFRAME) WITH THE FOLLOWING CHARACTERISTICS: THERMCRAFT INC. MODEL # 2BHS-A-182436-1260 VOLTS - 460 3PHASE AMPS - 62 WATTS - 40,000 MAX OPERATING TEMP TOP- 2300 F MAX OPERATING TEMP BOTTOM - 1250 F RECIRCULATION FAN BELOW TO MOVE AIR WITHIN OVEN. SPACE PROVIDED FOR THE OVEN IS TO BE AS SHOWN ON THE FLOOR PLAN PREPARED BY BETTISWORTH NORTH, RECEIVED OCTOBER 27, 2011, COPY ATTACHED AS SKETCH 1.
  • $5,965 - Wednesday the 4th of April 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 18, DEADBOLTS FOR STORAGE ROOMS. PROVIDE DEAD BOLT FUNCTION AS PART OF LOCKSET FOR THE FOLLOWING TWELVE (12) STORAGE ROOMS: 110 STORAGE 122 COMPANY STORAGE 124 COMPANY STORAGE 126 STORAGE 132 COMPANY STORAGE 134 COMPANY STORAGE 202C STORAGE 204 STORAGE 206A STORAGE 212F STORAGE 214 STORAGE 216A STORAGE
  • $5,734 - Wednesday the 25th of January 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT WT COMPLEX BARRACKS
  • $4,720 - Monday the 16th of July 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 22, HBO REVISION. IN LIEU OF HBO WIRING DIAGRAM DRAWING SC4A DATED 04 MAY 2010 AND HBO POST DRAWING SC4 4 MAY 2010 IN APP DD OF THE RFP, USE THE ATTACHED HBO WIRING DIAGRAM DRAWING SC4A WITH REVISION DATE OF 31 MAY 2012 AND HBO POST DRAWING SC4 WITH REVISION DATE OF 31 MAY 2012. IT IS EXPECTED THAT THE ONLY ADDITIONAL WORK THAT WILL BE REQUIRED IS THAT EACH GFI BREAKER WILL BE CONNECTED ONLY TO THE TOP HOT&NEUTRAL TERMINAL OF EACH DUPLEX RECEPTABLE SERVED BY THE BREAKER, AND THEN REMOVE DUPLEX RECEPTABLE HOT&NEUTRAL SPLIT WIRE TABS FOR EACH DUPLEX RECEPTACLE, SILICONE SEAL AN OUTLET SAFETY CAP IN BOTTOM OUTLET OF EACH DUPLEX RECEPTACLE, LABEL BOTTOM RECEPTACLE OUTLET "NO POWER".
  • $46,250,000 - Thursday the 7th of June 2012
    Department Of Army
    W2SN ENDIST ALASKA
    DESIGN AND CONSTRUCT GENERAL SUPPORT AVIATION BATTALION HANGAR AT FORT WAINWRIGHT, ALASKA
  • $45,568 - Wednesday the 25th of January 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 16, TEST HEADER FOR FIRE PROTECTION PUMPS. PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION TO PROVIDE A TEST HEADER FOR THE OUTPUT VERIFICATION OF THE FIRE PROTECTION PUMPS. TEST HEADER SHALL BE INSTALLED AND USED FOR MEASURING PUMP OUTPUT AT PRELIMINARY AND FINAL TESTING. ALL MATERIAL SHALL BE UL LISTED OR FM APPROVED. TEST HEADER SHALL HAVE SIXTEEN 2.5" HOSE VALVES SUPPLIED BY A 12-INCH LINE. THE FLOW METER SHALL BE INSTALLED DOWNSTREAM OF THE PUMP AND UPSTREAM OF THE PIPING TO THE WATER STORAGE TANK AND PIPING TO THE TEST HEADER. FOR PRELIMINARY AND FINAL TESTING, THE FLOW TESTS SHALL BE DONE WITH THE TEST VALVE HEADER IN ACCORDANCE WITH NFPA 20. PROVIDE REVISED DRAWINGS AND SPECS AS NECESSARY TO SHOW THE TEST HEADER.
  • $3,176 - Wednesday the 13th of June 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 20, WOOD STAVE CULVERT. OVER EXCAVATE, BACKFILL, TEST AND BASED ON TEST RESULTS, PROPERLY DISPOSE OF WOOD STAVE PIPE DISCOVERED DURING EXCAVATION OF APRON.
  • $29,233 - Friday the 14th of October 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 11-2, WOOD AND ORGANICS AT STA 1+25/275, PART 2, FINAL- THIS IS A PART 2, FINAL OF A TWO PART MODIFICATION. SEE MODIFICATION P00009, PART 1, NTP, DATED OCTOBER 3, 2011, SIGNED BY PHIL L. SALMON, ADMINISTRATIVE CONTRACTING OFFICER, IN THE AMOUNT OF $25,000.00. THIS PART 2, FINAL IS BEING ISSUED IN THE AMOUNT OF $29,233.00 FOR A TOTAL NEGOTIATED AMOUNT OF $54,233.00 FOR CHANGE ITEM 11. THE SCOPE OF WORK REMAINS AS GIVEN IN P00009.
  • $25,418 - Thursday the 12th of April 2012
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES - CASE 19, PAVING WORKSHOP - ATTEND TWO DAY AIRFIELD PAVING WORKSHOP CONDUCTED BY COE TRANSPORTATION CENTER OF EXPERTISE. PARTICIPANTS TO INCLUDE PRIME CONTRACTOR'S QUALITY CONTROL STAFF INVOLVED IN AIR FIELD PAVING AND THE PAVING SUBCONTRACTOR'S FOREMAN AND QUALITY CONTROL STAFF. THE PERSON RESPONSIBLE FOR BATCH PLANT QUALITY CONTROL SHALL ATTEND THE FIRST DAY OF THE WORKSHOP. THE WORKSHOP WILL BE IN FAIRBANKS, LOCATION AND FACILITIES TO BE ARRANGED BY GOVERNMENT. THE WORKSHOP WILL BE HELD BEFORE THE START OF CONSTRUCTION OF ANY AIRFIELD PAVEMENTS (TO INCLUDE HANGAR BAYS), AND WILL BE COORDINATED WITH CONTRACTOR.
  • $25,000 - Tuesday the 4th of October 2011
    Department Of Army
    W2SN ENDIST ALASKA
    CONSTRUCT AAC HANGAR WITHIN 5' LINES-CASE 11-1, WOOD AND ORGANICS AT STA 1+25/275, PART 1, NTP. PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION TO DEAL WITH THE WOOD AND ORGANICS FOUND IN VICINITY OF STA 1+25/275 OF THE AIRCRAFT APRON SUCH THAT ORGANICS AND PARTICULARLY WOODY ORGANICS, ENCOUNTERED BENEATH THE APRON BE REMOVED AND THAT A GEOTECHNICAL ENGINEER OBSERVE THE BOTTOM OF THE EXCAVATION BEFORE BACKFILL IAW SECTION 5.8.2 OF THE GEOTECHNICAL RECOMMENDATION REPORT PREPARED BY SHANNON AND WILSON. PROPOSED AMOUNT SHOULD BE BASED ON SOME DETERMINATION OF SCOPE/MAGNITUDE OF EFFORT. AS PART OF PROPOSAL FOR THIS WORK, PROVIDE INFORMATION ON SCOPE/MANGITUDE OF EFFORT THAT WILL BE REQUIRED TO DEAL WITH ORGANICS/WOOD AT THIS LOCATION AND AS PART OF PROPOSAL PROVIDE INFORMATION ON HOW SCOPE AND MAGNITUDE OF EFFORT WAS DETERMINED SO PROPOSED SCOPE/MAGNITUDE OF EFFORT CAN BE REVIEWED AND VALIDATED.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.