The Collier Report of U.S. Government Contracting

Old School Reporting Using Modern Technology

Wecc Inc

  • Wecc Inc

  • View government funding actions
  • Fayetteville, NC 283014705
  • Phone: 910-433-3052
  • Estimated Number of Employees: 28
  • Estimated Annual Receipts: $10,913,493
  • Business Start Date: 1997
  • Contact Person: Mamo Meaza
  • Contact Phone: 910-433-3052
  • Contact Email: mmeaza@weccinc.com
  • Business Structure:
  • Corporate Entity (Not Tax Exempt)
  • Business Type:
  • Minority Owned Business
  • Self Certified Small Disadvantaged Business
  • For Profit Organization
  • Black American Owned
  • Subchapter S Corporation
  • Industries Served: New Single-Family Housing Construction (except For-Sale Builders), Industrial Building Construction, Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, Highway, Street, and Bridge Construction, Other Heavy and Civil Engineering Construction, Structural Steel and Precast Concrete Contractors, Electrical Contractors and Other Wiring Installation Contractors, Plumbing, Heating, and Air-Conditioning Contractors, Other Building Equipment Contractors, Painting and Wall Covering Contractors, Flooring Contractors, Site Preparation Contractors, All Other Specialty Trade Contractors, Prefabricated Metal Building and Component Manufacturing, Transportation Equipment and Supplies (except Motor Vehicle) Merchant Wholesalers, Professional, Scientific, and Technical Services
  • Product Areas: MINING, ROCK DRILLING, EARTH BORING, AND RELATED EQUIPMENT, MINING,ROCK DRILLING,EARTH BORE EQ, MISCELLANEOUS CONSTRUCTION EQUIPMENT, MISC CONTRUCT EQ, WAREHOUSE TRKS & TRACTORS SELF-PROP, WAREHOUSE TRUCKS AND TRACTORS, SELF-PROPELLED, COMPRESSORS AND VACUUM PUMPS, POWER AND HAND PUMPS, GENERATORS AND GENERATOR SETS, ELECTRICAL, GENERATORS & GENERATOR SETS ELECT, MAINT/REPAIR/REBUILD OF EQUIPMENT- PUMPS AND COMPRESSORS, MAINT-REP OF PUMPS & COMPRESSORS, LEASE-RENT OF PUMPS & COMPRESSORS, LEASE OR RENTAL OF EQUIPMENT- PUMPS AND COMPRESSORS

Sampling of Federal Government Funding Actions/Set Asides

In order by amount of set aside monies.

  • $937 - Friday the 30th of March 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS TO MODIFIFY CONTRACT TO REPAIR LEAK IN 3" SHOWER WASTE LINE IN THE RESIDENT CHAMBERS FOR JUDGE HUMRICKHOUSE ON THE 2ND FLOOR OF THE CENTURY STATION FEDERAL BUILDING AND COURTHOUSE IN RALEIGH, NC.
  • $928,655 - Wednesday the 26th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    TASK ORDER AWARD TO REPLACE OVERHEAD ELECTRIC DISTRIBUTION LINES, UN660
  • $873 - Wednesday the 21st of December 2011
    Department Of Army
    W074 ENDIST WILMINGTON
    BASE
  • $8,653 - Friday the 9th of December 2011
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    8(A) MACC; MOD 02&PCO 01
  • $5,882 - Tuesday the 10th of July 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    8(A) MACC
  • $585,000 - Wednesday the 26th of September 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    YOUTH CENTER MULTI-PURPOSE ACTIVITIES ROOM
  • $43,988 - Thursday the 19th of July 2012
    Department Of Navy
    NAVAL FAC ENGINEERING CMD MID LANT
    8(A) MACC - TASK ORDER AWARD FOR REPAIR FOUNDATION&WALLS, BLDG 133
  • $36,916 - Friday the 30th of March 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    A. THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THE CONTRACT SCOPE OF WORK AND SCHEDULE FOR PROJECT RE-START PER LINE ITEM NO. 0009 OF THIS MODIFICATION. B. FOR THE ORIGINAL CONTRACT SCOPE OF WORK REMAINING PLUS THE AMENDED SCOPE OF WORK IN THIS CHANGE MODIFICATION, THE FOLLOWING CONDITIONS ARE AGREED: 1. CONTRACTOR SHALL COMMENCE WORK ON OR BEFORE MARCH 27, 2012. 2. THE PROJECT SHALL BE SUBSTANTIALLY COMPLETED AND READY FOR ITS INTENDED USE ON OR BEFORE JULY 16, 2012. 3. FINAL COMPLETION OF ALL CONTRACT REQUIREMENT SHALL BE ACHIEVED NO LATER THAN JULY 27, 2012. 4. THE PERIOD OF PERFORMANCE WILL BE 122 CALENDAR DAYS. 5. WITHIN ONE (1) WEEK FOLLOWING NOTICE TO PROCEED, WECC, INC. SHALL PROVIDE AN ACCEPTABLE SUBMITTAL SCHEDULE AND SHALL MAKE SUBMITTALS TIMELY, AND SHALL PROVIDE A DETAILED SCHEDULE. 6. WITHIN 30 DAYS FOLLOWING THE NOTICE TO PROCEED, SHOULD WECC, INC. FAIL TO COMPLY WITH THESE PROVISIONS, OR FAIL TO MAKE SUBSTANTIAL PROGRESS AGAINST ITS SCHEDULE, GSA WILL PUT WECC, INC. ON NOTICE AND IF THE FAILURE(S) IS/ARE NOT CURED THERE WILL BE GROUNDS FOR TERMINATION FOR DEFAULT.
  • $3,670 - Friday the 30th of March 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS TO REMOVE AND DISPOSE OF ALL ASBESTOS FLOOR TILE AND ASSOCIATED MASTIC ADHESIVE ENCOUNTERED IN THE HUMRICKHOUSE CHMABERS SPACE IN ACCORDANCE WITH EPA AND STATE OF NORTH CAROLINA REGULATIONS. THIS MODIFICATION IS FOR THE DIRECT COST IMPACT ONLY FOR ASBESTOS ABATEMENT AND DOES NOT INCLUDE ANY CONSIDERATION FOR TIME IMPACT.
  • $3,444 - Tuesday the 10th of April 2012
    Public Buildings Service
    ACQUISITION DIVISION/SMALL PROJECTS
    THE PURPOSE OF THIS MODIFICATION IS FOR THE CONTRACTOR TO FURNISH AND INSTALL A DRYWALL PARTITION AND DOOR IN THE PUBLIC CORRIDOR TO SEPARATE THE 341 MEETING ROOM FUNCTION FROM THE REST OF THE FLOOR FOR SECURITY REASONS. REPAIR AND MATCH ADJACENT WALL AND FLOOR FINISHES.

© Copyright 2019
The Collier Report
published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources. No reliance should be made by readers or Collier Report subscribers. Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances. Requests for the modification of displayed information may be made to help.desk@1918.media.