Welch Mechanical Design Llc
- View government funding actions
- Belcamp, MD 21017
- Phone: 410-698-3024
- Corporate URL: WWW.WELCHMECHANICALDESIGNS.COM
- Estimated Number of Employees: 9
- Estimated Annual Receipts: $990,000
- Business Start Date: 2001
- Contact Person: Wayne Welch
- Contact Phone: 410-698-3024
- Contact Email: wayne_c_welch@hotmail.com
- Business Structure:
- Sole Proprietorship
- Business Type:
- For Profit Organization
- Limited Liability f
- Manufacturer of Goods
- Industries Served: Optical Instrument and Lens Manufacturing
- Product Areas: OPTICAL INSTRUMENTS, OPTICAL INSTRUMENTS, TEST EQUIPMENT, COMPONENTS AND ACCESSORIES
Sampling of Federal Government Funding Actions/Set Asides
In order by amount of set aside monies.
- $4,384 - Friday the 10th of July 2015
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $4,300 - Friday the 10th of July 2015
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $37,140 - Tuesday the 13th of November 2012
National Aeronautics And Space Administration
LANGLEY RESEARCH CENTER
CUSTOM 15U STACKABLE RACK FOR HU-25C FALCON JET - $3,522 - Friday the 10th of July 2015
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $2,568 - Friday the 10th of July 2015
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $23,800 - Monday the 7th of November 2011
National Aeronautics And Space Administration
LANGLEY RESEARCH CENTER
12U STACKABLE RACKS AND ASSOCIATED HARDWARE - $1,850 - Friday the 10th of July 2015
National Aeronautics And Space Administration
GODDARD SPACE FLIGHT CENTER
COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL. - $1,750 - Monday the 14th of November 2011
National Aeronautics And Space Administration
LANGLEY RESEARCH CENTER
12U STACKABLE RACKS AND ASSOCIATED HARDWARE - $16,000 - Monday the 10th of September 2012
National Aeronautics And Space Administration
LANGLEY RESEARCH CENTER
STACKABLE 14U RACKS - $149,967 - Thursday the 22nd of December 2011
Department Of Navy
NAVSUP FLT LOG CTR SAN DIEGO
GIMBAL POSITIONER ASSEMBLY
© Copyright 2019
The Collier Report published by 1918 Media LLC.
Information displayed in this dossier has been provided through available open source or public sources.
No reliance should be made by readers or Collier Report subscribers.
Funding actions are complicated and do not always represent dollar-for-dollar payments to vendors nor do they represent payments in certain instances.
Requests for the modification of displayed information may be made to help.desk@1918.media.